| Description | Apportionments | Developer | Other developments |
“Studentski grad” is where the most of the universities in Sofia are. The residents of this area are mostly young people coming from all of the country and from abroad to finish their education and get a degree.
LOCATION
“Studentski grad” is a residential area situated in the south-east part of Sofia city, on the lowest slopes of Vitosha mountain. To the north “Studentski grad” borders “Dianabad” residential area and the two are separated by “G. M. Dimitrov” boulevard. To the east it borders “Darvenitsa” residential area and “Sv. Kliment Ohridski” boulevard. The south border is with “Malinova dolina” residential area and the west border is “Simeonovsko shose” boulevard which separates “Studentski grad” from “Vitosha” district. The location of the area and the infrastructure and transportation in this part of the city provide a very fast and easy access to the city center, the administration and the retail and entertainment complexes.
We present to your attention a project for eight floor residential building that is expected to receive a license to build in September 2008. It is situated next to blok #61 and in front of “Densy” center.
The project has the following characteristics:
- high quality construction;
- developed infrastructure and communications;
- exceptional view to Vitosha mountain;
- very functional two and three room apartments;
- flexibility regarding different types of payment;
- 18 month period of time from license to build to license to use!!!
Specifications – forthcoming project for residential building – “Studentski grad”
1. Construction – traditional monolithic construction / Sidenor steel, Bulgarian concrete/
2. Walls;
2.1. ceramic bricks;
2.2. lime-cement plaster;
2.3. gypsum plastering;
3. Facades;
3.1. thermal insulation – 6cm penopolistyrol with silicone plaster – BAUMIT;
3.2. keratone and stone plastering in accordance to the architectural detail;
4. Windows – 5-cell PVC windows from German manufacturer;
5. Roof;
5.1. hydro insulation – two layer insulation with polyester 180g – PLUVITEC;
5.2 thermal insulation – 10 cm
6. Apartments floors – cement plaster;
7. Staircase and corridors floors – granitogres;
8. Doors;
8.1. entrance doors – solid security apartment doors;
8.2. internal apartment doors – interior doors with MDF furnishing panels;
8.3. garage doors – one wing – HORMANN;
8.4. basement doors – metal with security locking system;
9. Staircase and corridors walls – gypsum plastering and latex paint;
10. Garages and basements walls – lime-cement plaster;
11. Installations;
11.1. water supply and sewers – polypropylene distribution pipes, individual water-meter provided for every apartment, sewerage – PVC finishing;
11.2. heating – central heating;
11.3. power supply – standard-compliant heavy-current installation based on a project approved by the Architecture and urban Planning Directorate. Individual electricity-meter provided for every apartment;
11.4. doorbell, phone, intercom, cable and internet - installed in every apartment;
12. Electrical elevators – TECHNOS;
13. Environment entirely finished in accordance to the architecture plan;
14. Construction and finishing works period – 18 months.